Cluster Status

575 bytes added, March 20
Siku & Argo back to production
|- valign=top bgcolor="#f5faff"
<!-- BEGIN Siku online
END Siku online -->
| [[Siku ]] || style="color:green" | '''Online''' || [[Cluster Status#Outage schedule | - ]] ||
END Siku online <!-->BEGIN Siku offline
| [[Siku ]] || style="color:red" | '''Offline''' || [[Cluster Status#Outage schedule | March 18-20 2025 ]] || planned maintenance
<!-- BEGIN Siku offline
END Siku offline -->
|- valign=top bgcolor="#f5faff"
| [[Humus]] || style="color:#ff8c00" | '''Online''' || [[Cluster Status#Outage schedule | - ]] || No scheduler
|- valign=top bgcolor="#f5faff"
<!-- BEGIN argo GREENARGO ONLINE|- valign=top bgcolor="#f5faff" ->
| [[Argo ]] || style="color:green" | '''Online''' || [[Cluster Status#Outage schedule | -]] ||
-->
<!-- BEGIN argo offline
| [[Argo ]] || style="color:red" | '''Offline''' || [[Cluster Status#Outage schedule | March 18-20, 2025 ]] || planned maintenance
-->
|- valign=top bgcolor="#f5faff"
| [[Argo ]] || style="color:red" | '''Offline''' || [[Cluster Status#Outage schedule | March 18-20, 2025 ]] || planned maintenance
|}<!-- colors to use: "green", "red" and #ff8c00 for orange -->
Jobs will not be scheduled with a run time (<code>--time=</code>) that extends into the beginning of a planned outage period. This is so the job will not be terminated prematurely when the system goes down.
* '''March 18-20, 2025''' both '''Siku and Argo''' will be offline for network- and system maintenance.<br/>During the outage, the public IP addresses of both clusters will change and move to a different subnet and software updates will be installed.: '''UPDATE March 18, 08h30 NDT''': The There are currently no planned maintenance has started. We will continue to post updates hereoutages.
<!--
==== 2025 ====
 
* '''March 18-20, 2025''' both '''Siku and Argo''' will be offline for network- and system maintenance.<br/>During the outage, the public IP addresses of both clusters will change and move to a different subnet and software updates will be installed.
: '''UPDATE March 18, 08h30 NDT''': The planned maintenance has started. We will continue to post updates here.
: '''UPDATE March 20, 10h10 NDT''': The planned maintenance has been completed and job scheduling has been resumed.
* '''Siku''' is operating at reduced capacity due to problems with the cooling in the data centre. New jobs will not be started until we are confident that the temperature in the room will remain stable.
== Argo ==
=== 2025 ===
 
* '''March 18-20, 2025''' both '''Siku and Argo''' will be offline for network- and system maintenance.<br/>During the outage, the public IP addresses of both clusters will change and move to a different subnet and software updates will be installed.
: '''UPDATE March 18, 08h30 NDT''': The planned maintenance has started. We will continue to post updates here.
: '''UPDATE March 20, 10h10 NDT''': The planned maintenance has been completed and job scheduling has been resumed.
 
* Due to a critical cooling failure in the data-centre we had to perform an emergency shutdown of Argo on the morning of Saturday, February 15th. We expect Argo to become available again sometime on Monday, February 17.
: 12:30, Feb 15, 2025 (NST)